A building experience tailored to your needs
the Davana advantage
Transparent budget
Clear invoicing every week, no hidden surprises.
Weekly quality review
Validate each step to guarantee your satisfaction.
Customized design
Tailor-made solutions, adapted to the space, zero waste, everything useful.
Freedom of materials
Single point of contact
Direct contact, fast response guaranteed.
Flexibility assured
Easily modify your project as you go.
Bathroom
Renovate your bathroom, sleek and practical, waterproof and easy to maintain.
kitchen
Renovate your kitchen, optimized worktops, ergonomic and durable.
Water management
Under-slab water drainage, controlled drainage, healthy, stable slab.
update
Modernize your home with contemporary materials and a clean, durable finish.
Any questions?
Do I have to replace all my plumbing when renovating?
Not always. Decisions depend on the condition and age of the network.
-
We inspect piping for leaks, corrosion, pressure and obsolete materials.
-
Where appropriate, we replace with modern materials (e.g. PEX/copper), add shut-off valves and water hammer arrestors.
-
Upgrade drains and vents; check water heater and main valve.
-
Objective: long-term reliability and easy access for maintenance.
What to do in the event of damp or water under the slab (basement)?
We treat the cause and manage the water pressure.
-
Diagnosis: inspection of cracks, moisture tests, verification of external slopes and gutters.
-
Internal solutions: internal drain (French drain), sump with sump pump, membrane/vapor barrier under coating, injection (epoxy/polyurethane) into active cracks.
-
External solutions: foundation waterproofing and perimeter drain where available.
-
Network protection: installation or upgrading of a non-return valve to prevent sewer backups.
Every home is unique: we propose a plan with priorities, budget and written guarantees.
Which countertops for the kitchen?
-
Quartz: durable, easy-care.
-
Granite: natural, heat-resistant, requires sealing.
-
Laminate: economical, varied, less resistant to impact/heat.
-
Wood/butcher block: warm, regular maintenance (oil).
How long does a kitchen renovation take and what are the key stages?
-
Design & orders (1-3 weeks): survey, plans, choice of cabinets, countertops, fittings, electrics.
-
Preparation (1-2 weeks): area protection, controlled demolition, plumbing/electrical corrections, levelling.
-
Installation (1-3 weeks): cabinets, countertops (including lead time), sink/faucets, backsplash, finishing and commissioning.
Tip: any relocation of sinks, gas ranges or islands is planned in advance to avoid unexpected costs.
How do you ensure a long-lasting, mould-free bathroom?
The key: waterproofing + ventilation + finishing details.
-
Certified waterproofing membranes on walls and floors, correct slope to drain, flood test of shower tray before tiling.
-
Fan sized and ducted to the outside (timer/hygrostat recommended).
-
Appropriate joints (suitable mortar/epoxy if necessary) and sanitary silicone at transitions.
-
Faucets and thermostatic mixing valves comply with standards; access to maintenance hatches.
the davana expert

David Houde
Operations Manager
Transparent deck construction,
Starts here
Your next step is to contact us
1. Personalized listening from the first call
David himself takes the time to listen to you and collect your wish list, to make sure he understands your priorities.
2. Clear and constructive on-site consultation
During the consultation visit, he reviews your wishes, explores your budget and immediately identifies any technical constraints.
3. Tailor-made proposals and time for reflection
You’ll get a customized quote, and the time you need to study the offer before any commitment is made.
4. Reassuring site start-up
Once approved, David plans the site, briefs the team and makes sure your home is protected (blue carpets, full briefing).